The crossing on Forest Lane remains a toucan crossing.
The crossing on Forest Lane remains a toucan crossing.
(Long term closure remains in place at Channelsea/Manor Rd bridges, with an additional closure now due to start in January.)
(Long term closure remains in place at Channelsea/Manor Rd bridges, with an additional closure now due to start in January.)
@newhamcyclists.uk
bsky.app/profile/macl...
@newhamcyclists.uk
bsky.app/profile/macl...
@raynoldchow.bsky.social @edmondchuihw.bsky.social
@raynoldchow.bsky.social @edmondchuihw.bsky.social
@safecycleldn.bsky.social
@safecycleldn.bsky.social
Pic 4 also shows the new wands that were installed on the northbound C41 up to where it meets C27.
@camdencyclists.bsky.social
Pic 4 also shows the new wands that were installed on the northbound C41 up to where it meets C27.
@camdencyclists.bsky.social
Kerbed southbound cycle track is going in on Haverstock Hill, just south of the bend in C6.
Further north, before the Xmas break the uphill cycle track should be complete to just past the Belsize Grove junction.
@edmondchuihw.bsky.social @raynoldchow.bsky.social
Kerbed southbound cycle track is going in on Haverstock Hill, just south of the bend in C6.
Further north, before the Xmas break the uphill cycle track should be complete to just past the Belsize Grove junction.
@edmondchuihw.bsky.social @raynoldchow.bsky.social
One turn restriction is being removed... implemented over 2 separate Saturdays!!
In the revised plan here, the 2nd turn restriction that had been proposed for removal will now remain in place.
@edmondchuihw.bsky.social @raynoldchow.bsky.social
One turn restriction is being removed... implemented over 2 separate Saturdays!!
In the revised plan here, the 2nd turn restriction that had been proposed for removal will now remain in place.
@edmondchuihw.bsky.social @raynoldchow.bsky.social
This possibly signals the end of the works, so there could be some road resurfacing along here sometime soon.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
This possibly signals the end of the works, so there could be some road resurfacing along here sometime soon.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
Phoenix Place (C6),
Bishop St (C27), @marcus-on-a-bike.bsky.social
Whiston Rd (Q)
Phoenix Place (C6),
Bishop St (C27), @marcus-on-a-bike.bsky.social
Whiston Rd (Q)
The previous left-turn slip road here was removed.
The previous left-turn slip road here was removed.
The existing road closure will remain until January.
The existing road closure will remain until January.
2 bus stops that impacted visibility of oncoming traffic have been relocated.
@raynoldchow.bsky.social @edmondchuihw.bsky.social @hackneylcc.bsky.social
2 bus stops that impacted visibility of oncoming traffic have been relocated.
@raynoldchow.bsky.social @edmondchuihw.bsky.social @hackneylcc.bsky.social
@edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
@edmondchuihw.bsky.social @raynoldchow.bsky.social @safecycleldn.bsky.social
bsky.app/profile/macl...
bsky.app/profile/macl...
C5 route doesn't actually pass through this junction (although I think the TfL Cycle Map may previously have incorrectly mapped C5 as going that way).
C5 route doesn't actually pass through this junction (although I think the TfL Cycle Map may previously have incorrectly mapped C5 as going that way).
This is continuous with the (not yet Cycleways worthy) Q15 route.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
This is continuous with the (not yet Cycleways worthy) Q15 route.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
That section of the the Hackney to Camden route should really be decommissioned/rerouted.
That section of the the Hackney to Camden route should really be decommissioned/rerouted.
Note the zebra paving for the future crossing in pic 1.
@raynoldchow.bsky.social @edmondchuihw.bsky.social
Note the zebra paving for the future crossing in pic 1.
@raynoldchow.bsky.social @edmondchuihw.bsky.social