Snoqualmie Pass
banner
snoqualmiepass.wsdot.wa.gov
Snoqualmie Pass
@snoqualmiepass.wsdot.wa.gov
Pinned
UPDATE #5: Look at the quick work by our contractor last week removing the damaged Bullfrog Road overpass. Now our bridge engineers are designing the new westbound section. We’ll keep you posted on timeline and schedule for construction.
I-90 EB MP 136-138 (Vantage Bridge): All lanes now open after completion of emergency repairs. No width restrictions.
December 19, 2025 at 10:35 PM
I-82 EB MP 93 (west of Elk Heights): All lanes open now.
December 19, 2025 at 2:57 PM
I-90 EB at MP 93 (west of Elk Heights): One lane open, the other lane blocked due to multiple spinouts.
December 19, 2025 at 11:37 AM
I-90 updates
1. Two left lanes closed on EB I-90 at MP 36 between North Bend & the summit due to embankment erosion.
2. Full closure WB I-90 this week at Bullfrog (exit 80) to install girders for the new westbound overpass. Detour via the off & on ramps.
December 15, 2025 at 7:36 PM
UPDATE #7: Work to repair the I-90 Bullfrog Road overpass will require a full westbound closure to install girders. The one-week closure starts Monday, Dec. 15. Travelers will be able to continue onto west on I-90 using the off- and on- ramp and exit 80.
UPDATE #5: Look at the quick work by our contractor last week removing the damaged Bullfrog Road overpass. Now our bridge engineers are designing the new westbound section. We’ll keep you posted on timeline and schedule for construction.
December 15, 2025 at 7:34 PM
Advanced Notice: Westbound I-90 at Snoqualmie Pass (MP 52) will have intermittent closures on Wednesday, Dec. 3 from 10 am to 3 pm. Plan for hour-long delays.
December 3, 2025 at 12:27 AM
We have an EB lane closure on I-90 across the Vantage Bridge (MP 136-137). A transition plate, part of the deck replacement project, has come loose. The lane will remain closed until crews can evaluate Friday and make a repair.
November 14, 2025 at 4:55 AM
*REMINDER*
The Snoqualmie Pass mountain pass webpage is the best place to view 24/7 travel info. It has cameras, road conditions, weather & travel times.
wsdot.com/travel/real-...
WSDOT Travel Center
wsdot.com
November 3, 2025 at 8:32 PM
The weather across the pass is going to be a little wicked today and into the weekend, with lots of rain forecasted. Please remember to slow down and turn on your headlights for safety.
October 31, 2025 at 3:02 PM
UPDATE #5: Look at the quick work by our contractor last week removing the damaged Bullfrog Road overpass. Now our bridge engineers are designing the new westbound section. We’ll keep you posted on timeline and schedule for construction.
October 28, 2025 at 9:30 PM
UPDATE #4: WB I-90 has REOPENED near Cle Elum following the removal of the damaged Bullfrog Road overpass. Crews worked nonstop overnight so we could reopen I-90 earlier than expected. Our bridge engineers are designing a new WB overpass. We'll keep you posted on next steps!
October 25, 2025 at 1:58 AM
UPDATE #3: WSDOT and contractor crews made great progress overnight, removing the damaged westbound Bullfrog Road overpass. With the span now removed, crews are clearing debris from the demolition site. Target is still to reopen the westbound lanes by early next week.
October 24, 2025 at 4:14 PM
UPDATE #2: An emergency contractor will demolish the damaged Bullfrog Road overpass beginning Oct. 23. One lane of EB I-90 will be closed during demo from 6 p.m. Oct. 23 to 8 p.m. Oct. 25. WB I-90 expected to reopen early next week. Traffic is detoured at Exit 80.
October 23, 2025 at 9:31 PM
SR 410 Chinook Pass and SR 123 Cayuse Pass close for the season Friday, Oct. 24,

Up to 3 feet of snow forecasted Friday through Monday with continued winter weather into next week.
October 23, 2025 at 5:43 PM
UPDATE: I-90 remains closed WB at Exit 80 near Cle Elum after an oversized load struck the overpass. Travelers are being detoured at Exit 80 via the off- and on-ramp. Crews will be out today to assess the damage. The Washington State Patrol is investigating. No estimate for a reopening.
October 22, 2025 at 3:12 PM
Traffic is being detoured off of I-90 to the on and off ramp to get around the damaged overpass and debris on the roadway.
The WB lanes of I-90 at MP 80 near Cle Elum are blocked due to debris from a semi-truck hitting an overpass.
October 22, 2025 at 5:57 AM
The WB lanes of I-90 at MP 80 near Cle Elum are blocked due to debris from a semi-truck hitting an overpass.
October 22, 2025 at 5:16 AM
The backups on eastbound I-90 near Easton have cleared.
Travelers are experiencing delays on Eastbound I-90 near Easton (MP 67) due to a collision. Traffic is reduced to one lane.
October 11, 2025 at 11:29 PM
Travelers are experiencing delays on Eastbound I-90 near Easton (MP 67) due to a collision. Traffic is reduced to one lane.
October 11, 2025 at 7:23 PM
Travelers are experiencing delays on eastbound I-90 across the Vantage Bridge due to weekend traffic.
October 10, 2025 at 9:25 PM
Good news about US 97 Blewett Pass! It's back open!
(1/3) ATTN: US 97 Blewett Pass has reopened as of 1:30PM. This is great news for those who are tired of taking the detour, but with fire response activity still happening in the area, here's some important things to keep in mind...
October 7, 2025 at 9:36 PM
Important I-90 Travel Update
Double-lane closure on eastbound I-90, west of the summit (milepost 49) daytime only Friday, Saturday and Sunday (Oct. 3, 4 and 5) for drainage repair. There are four lanes in this section.
October 3, 2025 at 12:45 AM
I-90 WB at MP 54 (Snoqualmie Pass) is now clear.
October 2, 2025 at 3:21 AM
I-90 WB at MP 54 (Snoqualmie Pass) traffic reduced to one lane due to a collision.
October 2, 2025 at 1:34 AM
The Labor Mountain Fire will keep US 97 Blewett Pass closed. This means we will see more traffic on I-90. Pls know we have several work zones between the summit of Snoqualmie Pass and Vantage that will create some added travel time.
US 97 Blewett Pass remains closed between MP 149-178 due to the Labor Mountain Fire. The pass has been closed since Sept. 21. Fire remains active on both sides of the road and visibility is low. There is no estimated time to reopen. When Blewett is closed, that puts added traffic on I-90 and US 2.
September 30, 2025 at 4:28 PM