A year later, what has been the effect? I looked at building permit data to see. More in the 🧵 or in my blog post 👇 #yegcc #yeg
www.jacobdawang.com/blog/2025/ed...
A year later, what has been the effect? I looked at building permit data to see. More in the 🧵 or in my blog post 👇 #yegcc #yeg
www.jacobdawang.com/blog/2025/ed...
these two plans have same number of bedrooms - but the double loaded corridor requires 50% more floor area (PAB: 6,500 sf v. DLC: 9,750 sf)
quality of the units is also radically different (100% dual/corner aspect v. 29%)
PAB savings: $300/sf * 3,250 sf = $975k/floor
these two plans have same number of bedrooms - but the double loaded corridor requires 50% more floor area (PAB: 6,500 sf v. DLC: 9,750 sf)
quality of the units is also radically different (100% dual/corner aspect v. 29%)
PAB savings: $300/sf * 3,250 sf = $975k/floor