Can you find a scar?
Can you find a scar?
You're just a victim of the Dunning Kruger effect.
You're just a victim of the Dunning Kruger effect.
And "Propellant Transfer Test" means "Just do whatever, you'll never need to test orbital vehicle to vehicle transfer before CDR; it is so trivial".
LMAO
And "Propellant Transfer Test" means "Just do whatever, you'll never need to test orbital vehicle to vehicle transfer before CDR; it is so trivial".
LMAO
The original technical milestones obviously changes, otherwise they couldn't have "completed" 72.5% and have so much left to do.
LMAO
Sorry, their "chief engineer" is not an engineer, he's a con man.
The original technical milestones obviously changes, otherwise they couldn't have "completed" 72.5% and have so much left to do.
LMAO
Sorry, their "chief engineer" is not an engineer, he's a con man.
Lol, ok.
For the uncrewed landing (next after CDR), they simply need to build like 15 Starships, put 14 in orbit, launch #15, have it flawlessly dock and xfer propellant with the 14 (never been done), then fly to the moon, land, launch, return and land.
Lol, ok.
For the uncrewed landing (next after CDR), they simply need to build like 15 Starships, put 14 in orbit, launch #15, have it flawlessly dock and xfer propellant with the 14 (never been done), then fly to the moon, land, launch, return and land.
They aren't starting from scratch; we have over 75 years of rocket development to build from, and these fools are failing left and right. They even ruined the launchpad!. Just an absolute joke of a company.
Sorry, they changed.
Keep dreaming that Elon is going to pull a rabbit out of a hat.
They aren't starting from scratch; we have over 75 years of rocket development to build from, and these fools are failing left and right. They even ruined the launchpad!. Just an absolute joke of a company.
Sorry, they changed.
Keep dreaming that Elon is going to pull a rabbit out of a hat.
They haven't completed CDR, and they are 72.5% of the way through the funding.
Now look at the rest of the original schedule. I know you aren't an engineer, and that you are incredibly stupid, but even you should be able to tell there is >27.5% work after CDR.
They haven't completed CDR, and they are 72.5% of the way through the funding.
Now look at the rest of the original schedule. I know you aren't an engineer, and that you are incredibly stupid, but even you should be able to tell there is >27.5% work after CDR.
What a goddamn moron.
What a goddamn moron.
LMAO
The contract was to do the job outlined below, which doesn't include building a launchpad, etc; that's what private money has to cover.
They will run out of contract money and won't deliver.
Then they'll beg
LMAO
The contract was to do the job outlined below, which doesn't include building a launchpad, etc; that's what private money has to cover.
They will run out of contract money and won't deliver.
Then they'll beg