Space Policy PhD Student
Believer in a Better Tomorrow
Option 1: a JPL led design using a bigger skycrane, similar to the landing system for MSL/M2020 Estimated $6.6B-$7.7B.
Option 2: Use a "heavy lander" from "existing commercial partners." Est. $5.8B-$7.1B
Both options deliver the same payload.
Option 1: a JPL led design using a bigger skycrane, similar to the landing system for MSL/M2020 Estimated $6.6B-$7.7B.
Option 2: Use a "heavy lander" from "existing commercial partners." Est. $5.8B-$7.1B
Both options deliver the same payload.